Ship Footeon-ready autonomy with your machines

Equipment OEMs, integrators, brand sourcing teams and materials suppliers all touch the same shoe. Partnering means the plant gets one autonomy layer instead of five disconnected ones.

Four ways to partner

Each has a defined technical path and a defined commercial one.

Equipment OEMs

Cutting tables, stitchers, presses, lasting machines and ovens. Ship your machine Footeon-ready with a certified connector and a joint reference line.

  • Certified connector programme
  • Joint reference deployments
  • Revenue share on attached lines

Systems integrators

Deploy and support Footeon inside plants you already serve, with training, sandbox access and deployment playbooks.

  • Certified engineer training
  • Sandbox and twin simulator access
  • Deployment margin

Brand sourcing networks

Standardise quality evidence across your contract manufacturers with one audit format and one set of quality agreements.

  • Brand-ready audit exports
  • Per-brand tenant isolation
  • Network-wide benchmarks

Materials suppliers

Leather, textile, EVA, PU, rubber and adhesive suppliers whose lots drive process windows. Feed datasheets in, get outcome data back.

  • Datasheet integration
  • Lot-level outcome feedback
  • Joint process-window validation

Every node has a machine behind it

A certified connector turns a machine into a node the agents can actually control.

RUN-4417 · Velo Trainer 2 · Line B · plant HCMC-03agent graph
Twin simulate — Yield-and-Energy — SUCCEEDED Twin simulate twin.simulate_run ✓ SUCCEEDED Cut and nest — Cut-and-Nest — SUCCEEDED Cut and nest cut.nest_optimize ✓ SUCCEEDED Stitch upper — Stitch-and-Upper — SUCCEEDED Stitch upper stitch.tension_control ✓ SUCCEEDED Mould sole — Mold-and-Sole — SUCCEEDED Mould sole mold.density_control ✓ SUCCEEDED Last upper — Last-and-Bond — SUCCEEDED Last upper last.fit_control ✓ SUCCEEDED Bond sole — Last-and-Bond — APPROVAL Bond sole bond.window_control ! APPROVAL Inspect pair — Quality-and-Fit — SUCCEEDED Inspect pair quality.inspect ✓ SUCCEEDED Finish and pack — Robot-and-Assembly — SUCCEEDED Finish and pack robot.finish_pack ✓ SUCCEEDED
View as table
Text equivalent — nodes, owning agent, dependency and status
#NodeAgentDepends onStatus
01 Twin simulate Yield-and-Energy — SUCCEEDED
02 Cut and nest Cut-and-Nest Twin simulate SUCCEEDED
03 Stitch upper Stitch-and-Upper Cut and nest SUCCEEDED
04 Mould sole Mold-and-Sole Stitch upper SUCCEEDED
05 Last upper Last-and-Bond Mould sole SUCCEEDED
06 Bond sole Last-and-Bond Last upper APPROVAL
07 Inspect pair Quality-and-Fit Bond sole SUCCEEDED
08 Finish and pack Robot-and-Assembly Inspect pair SUCCEEDED

Becoming a certified connector

Roughly eight weeks from first call to a listed connector.

  1. Scope

    Agree which parameters are readable, which are writable, and which are validated.

    week 1

  2. Build

    Implement against the connector SDK in Python, Go or Rust with our engineers on call.

    weeks 2–5

  3. Certify

    Conformance suite, latency benchmark and fail-closed behaviour verified on real hardware.

    weeks 6–7

  4. List

    Published in the connector catalogue and available to every Footeon plant.

    week 8

Connectors available today

Shipped adapters across the plant. Certified partner connectors are added here.

Cutting and nesting

  • Atom cutting tables
  • Comelz CZ series
  • Zünd G3
  • Lectra Versalis
  • Generic CNC / G-code

Stitching and lasting

  • Programmable stitchers
  • Lasting machine PLCs
  • Toe / side / heel lasters
  • Conveyor MES signals
  • Barcode and RFID pair tracking

Moulding and bonding

  • Compression press controllers
  • PU / EVA injection lines
  • Primer and cement stations
  • Activation ovens
  • Press pressure and cure sensors

Plant systems

  • SAP and Oracle ERP
  • PLM (Centric, PTC)
  • MES / MOM systems
  • OPC UA, MQTT, Modbus TCP
  • Historian (PI, Ignition)

Connectors ship as versioned adapters. Anything not listed is reachable through OPC UA, MQTT, Modbus TCP or the Footeon REST/gRPC API.

What each side gets

The trade is straightforward.

What partners get

  • Differentiated machines that ship with autonomy attached
  • Access to the connector SDK, sandbox and twin simulator
  • Joint reference deployments and case studies
  • Commercial share on attached lines

What Footeon gets

  • Faster deployments through certified connectors
  • Distribution into plants we would reach slowly alone
  • Better process models through supplier datasheets
  • Field feedback from integrators who see many plants

Partner programme at a glance

Early stage and deliberately small.

  • 18 shipped machine and system connectors
  • 8wk typical connector certification timeline
  • 4 partner programme tracks
  • 3 joint reference deployments in scope [PLACEHOLDER]

What a connector looks like

A connector maps machine capabilities to Footeon tools with enforced ranges.

connector_press.pypython
from footeon.connector import Connector, Capability

press = Connector(vendor="acme-press", protocol="opcua")

press.capability(Capability(
    tool="press.set_recipe",
    writable=["temp_c", "pressure_bar", "dwell_s"],
    readable=["temp_actual", "pressure_actual", "cycle_state", "alarms"],
    ranges={"temp_c": (140, 190), "pressure_bar": (2.0, 5.0)},
    validated=True,
    fail_closed="hold_last_known_good",
))

press.certify()   # runs conformance, latency and fail-closed suites

Conformance suite

  • Range enforcement under adversarial input
  • Latency budget at p95 and p99
  • Behaviour on network loss
  • Fail-closed to last known-good recipe

From partner deployments

Illustrative outcomes from joint reference lines.

“The nesting agent found yield our best pattern cutter could not — and then explained the layout hide by hide. We stopped arguing about scrap and started managing it.”
Head of Cutting Operations · Andean Footwear Co. [Illustrative]

Leather yield 79.1% → 87.4%

“Bonding is where our warranty costs live. Having an agent watch humidity, primer flash-off and press pressure on every pair — and stop for a human when it wants to move a validated parameter — is the first thing that has actually moved delamination.”
Quality Director · Verta Sportswear [Illustrative]

Delamination returns −71%

“We run 40 model changeovers a month. Simulating the nest, the mould recipe and the bond window in the twin before the line starts took hours out of every launch.”
Plant Manager · Đông Nam Footwear [Illustrative]

Changeover time −46%

Design-partner scenarios are illustrative and modelled on public footwear-manufacturing benchmarks — named references are [PLACEHOLDER] pending customer approval.

Partner security requirements

Connectors run inside the sandboxed edge runtime and inherit its controls.

Certifications and posture

  • In progress SOC 2 Type II — audit window open [ASPIRATIONAL]
  • In progress ISO 27001 — controls implemented, certification pending [ASPIRATIONAL]
  • Supported GDPR — EU data residency and DPA available
  • Supported Per-tenant isolation for patterns, lasts and construction IP
  • Supported On-premises deployment with zero telemetry egress

Agent-specific assurances

  • Graduated autonomy: observe → recommend → act-with-approval → act, set per agent and per parameter
  • Human-in-the-loop approval gates on every validated bonding, lasting and moulding parameter
  • Immutable, quality-grade audit log of every agent action, approval and setpoint write
  • Guardrails and schema validation on tool calls; fail-closed to last known-good recipe
  • Sandboxed factory-edge runtime with signed model artefacts and version rollback
  • Scoped permissions per line, per station and per operator role

Read the security overview →

Partner questions

  • No. Footeon is a software and factory-edge autonomy layer that sits on top of the machines you already run. We connect over OPC UA, MQTT, Modbus TCP and vendor SDKs, read sensors and vision, and write setpoints back through the controls you already trust — with approval gates on any validated parameter.

Make your machines Footeon-ready

Tell us what you build and which plants you serve. We will scope a connector and a reference line.